Click on the link above to watch the last slip form pour at the Lee Tunnel which started in June this year. It is a time lapse video of the 29 day pour for the central wall in the pumping shaft. Total volume supplied was 7km3…
Lee Tunnel Time Lapse Video
24th September, 2014