At CEMEX Preston Asphalt plant the team have been busy installing several site improvements.
Their cold feed bins have been repaired helping prevent spillages (image bottom), along with new grids fitted (image top) to stop oversized stones running through the plant. A new seal has been installed on their drier helping control spillage and keeping any particles from entering the burner.
Finally, a new vibrator was fitted to the RAP chute.