Well done to the team at Attercliffe Railhead for achieving 30,000 tonnes for three months in a row.
Mark Grimshaw-Smith said: “Thank you to Steve Taylor and your team for the great work in pulling these volumes through consistently and safely on a challenging site. Great work!”